The company Urbasolar SAS (France) plans at the end of 2019 to put into operation in the Turkestan region of Kazakhstan (previously - South Kazakhstan region) solar power plant "Zadar-1" with a design capacity of 14 MW. Construction and installation work has already begun. Construction is carried out on a land area of 30 hectares.

Urbasolar SAS is a private company established in 2006, engaged in the development, construction and operation of large-scale photovoltaic power plants. The company has been present in Kazakhstan since 2012, since the implementation of the project in Astana to install solar panels on the roofs of buildings.

Power, MW: 14
Location: Turkestan region
Type of project: Regional
Status: In implementation
Technology type: Solar
Executor: LLP "KAZ  GREEN  TEK  SOLAR"
Дата включения в перечень: 18.07.2016
Бизнес-тип: Greenfield